Sunday, 17 May 2009

We Are Chaos Junkies

The paint on the bathroom countertop was not dry yet so The Geek figured she might as well move the plumbing for the kitchen sink while she was hooking up the connections for the bathroom sink.The contents of the armoire room were moved away from the cupboard to facilitate the new holes in the floor.The contents of that cupboard were moved into the living room, where I am keeping the laundry I cannot do because the drain in the basement is still too full of water to use the washing machine. I'll solve that problem tomorrow.

And at this very second, we have no functional sinks on this level of the house. Which is much better than it might have been if The Geek had proceeded with her original plan to remove the countertops while she fit the new ones. We might have been without a kitchen sink for...eons.
The water should be back on in here in about 45 mintues.

No comments:

Post a Comment