This strip of brass that joins the linoleum/bamboo edge came back from Germany shrink-wrapped to the poster tube. They had 8' (and 10'?) lengths as well but we couldn't figure out how to get them on the plane.The edge between the tub and the tile is caulked and the paper holder is installed. The paper holder couldn't have come at a better time. I would frequently forget to move the paper when I showered and it would get all soggy. It would then have to spend the day on the radiator to dry out. I am hoping fairly soon we can shut off the boiler, so it is a good thing that the paper has a better chance to stay dry.
Very nice! Looking really sharp!
ReplyDelete