The Geek tackled the basement pantry this spring.
However, before she could do anything, she had to deal with 'the tank'. The tank took up at least a third of the room in the pantry and she had no intention of insulating around it. After having an environmental company drain about 180 litres of fuel oil, a couple of friends popped by to help us push it out of the basement as it was too heavy for The Geek and I alone.
However, before she could do anything, she had to deal with 'the tank'. The tank took up at least a third of the room in the pantry and she had no intention of insulating around it. After having an environmental company drain about 180 litres of fuel oil, a couple of friends popped by to help us push it out of the basement as it was too heavy for The Geek and I alone.
You have to love a picture of something completed! Looks great.
ReplyDelete